ProMedica Health System, a locally owned, non-profit healthcare organization serving Northwest Ohio and Southeast Michigan established in 1986, has completed the renovation and construction of their new corporate headquarters in downtown Toledo, Ohio. The move to downtown’s waterfront entailed the renovation of the vacant historical Edison Steam Plant, renovation of the adjacent former Key Bank building, and construction of a new multi-level parking structure.
In cooperation with HKS, SSOE was the firm of choice to provide full mechanical, electrical, plumbing, technology, and fire protection (MEPT / FP) design services for the two large commercial office structures. Our team of experts carefully evaluated the existing buildings and the historic aspect of each building that needed to be maintained, and provided detailed engineering design for the HVAC and plumbing systems, the Data / Fire / Security systems, the fire suppression systems, and the electrical system, including site lighting.
The existing Key Bank building will house a new YMCA space in the basement level, the Chop House restaurant on the lobby level, and office spaces on floors two, three, and four. The large variety of mixed building use is unique to this type of project but was successfully handled by the design team. SSOE is proud to be a part of this local project that promotes economic growth and urban revitalization. The project was completed in August 2017.